|
Description:
1.) First coat on the raw,
sanded floor
surface (see. Floor
preparation); approx. 40 ml/m2
2.)Application mistakes can
be repaired up to 30 minutes after
the first coat.
Simply find and repair the
mistake in the still wet surface.
3.) Drying time 8-12 hours;
Wood temperature approx. 18-22
°C;
Relative humidity approx.
50-60%.
4.) The dry surface can be, if
desired, sanded using a fine (400
Grain) sanding paper or smoothed using a
scotch pad.
5.) Second coat approx. 40
ml/m2
6.) Drying time 8-12 hours;
Wood temperature approx. 18-22
°C;
relative humidity approx.
50-60%.
Finished surface after 2 days |