|
Transparent Polyx®-Oils and Wood Wax Finish
Clear Extra Thin
1.) First coat on the raw,
sanded floor
surface (see. Floor
preparation);
approx. 40 ml/m2
2.) „Application mistakes“ can
be
repaired up to 30 mins after
the first coat.
Simply find and repair the
mistake in the still wet surface.
3.) Drying time 8-12 hours;
Wood temperature approx. 18-22
°C;
relative humidity approx.
50-60%.
4.) The dry surface can be, if
desired,
sanded using a fine (400
Grain) sanding
paper or smoothed using a
scotchpad.
5.) Second coat approx. 40
ml/m2
6.) Drying time 8-12 hours;
Wood temperature approx. 18-22
°C;
relative humidity approx.
50-60%.
Finished surface after 2 days |